Dickerson Infrastructure repaired approximately 12.61 miles (66,000 LF) of canal banks.
Canal bank repairs included removing existing vegetation, backfilling and compacting the banks to 2.5H:1V slopes (2H:1V slopes with riprap along the south canal bank), installing high-performance turf reinforcement mats on the canal banks for the entire length of the project, sodding, and installing 12-inch diameter HDPE pipes for berm drains.